Lookout Park Playground Installation

Contractor will provide labor and materials for the following scope of work to replace the playground at Lookout Park: • Demolish and dispose of all existing play structures (see attached photo). • Demolish and dispose of approximately 3,305 square feet (sf) of existing 3.5” of Pour-In-Place (PIP) rubberized surfacing system. • Demolish and dispose of approximately 3,305 sf of existing reinforced concrete sub surfacing at 4” thick and existing concrete footings. Concrete curbing to remain. • Prepare and install approximately 3,305 sf of 4” thick reinforced 3,000psi concrete sub-surface with a 95% compacted base. Rebar to be #3 at 18” on center. • Install all play equipment and shade structures shown on the attached plan per manufacturers drawings and details. • The playground equipment shall be provided by Owner. • The PIP Rubberized surfacing system shall be installed by Owner. Contractor to coordinate installation of PIP rubberized surfacing system prior to installation of play equipment and shade structures. • Coordinate delivery of all play equipment, anticipated mid-late March 2025, with Owner and manufacturer.
No plan holders available for this project